Shop 'n Save - O'Fallon, Missouri
NOTE:
All plan sheets are in
DWF
format - See here for the program to open
DWF
files.
CIVIL
C1.1 - CIVIL SITE PLAN
 
(For Reference Only)
C2.1 - SITE GRADING PLAN
 
(For Reference Only)
ARCHITECTURAL
CS1.1 - COVER, CODE BLOCK, INDEX
 
(Addendum #2 - 5/18/10)
F1.1 - PROPOSED FIXTURE PLAN
 
(Change Order #1 - 5/27/10)
A0.1 - SITE PLAN
A1.0 - PROPOSED FLOOR PLAN
 
(Change Order #1 - 5/27/10)
A1.1 - PLAN NOTES - DETAILS
A1.2 - ENLARGED PLANS - CHKOUT/OFF/PHARM
 
(Change Order #1 - 5/27/10)
A1.3 - ENLARGED PLANS - BAKERY/DELI/MEAT
A2.0 - ELEVATIONS
A2.1 - ENLARGED ELEVATION, VESTIBULE
A3.1 - VESTIBULE SECTIONS -ENTRANCE
A3.2 - VESTIBULE SECTIONS - LOW/CARTS
A3.3 - CANOPY - FRONT WALL SECTIONS
A3.4 - DRIVE-UP/ SIDE SECTIONS
A3.5 - DOCK - REAR WALL SECTION
A3.6 - VESTIBULE SIDE SECTION / PLAN
A3.7 - MEZZANINE STAIRS
A4.1 - CONCRETE PLAN
 
(Addendum #1 - 5/17/10)
A4.2 - FLOOR TILE PATTERN
 
(Addendum #2 - 5/18/10)
A4.3 - CEILING PLAN
A4.4 - ROOF PLAN
 
(Addendum #1 - 5/17/10)
A5.1 - ROOF DETAILS
A5.2 - MISC DETAILS AND SECTIONS
A5.3 - MISC DETAILS AND SECTIONS
A6.1 - SCHEDULES - ROOM FINISH, WALLS
A7.1 - INTERIOR WALL SECTIONS
A8.1 - SCHEDULES - DOORS
INTERIOR DÉCOR
D-1 - DÉCOR FLOOR PLAN
D-1 PAINT - DÉCOR PAINT ELEVATIONS
 
(Addendum #1 - 5/17/10)
WD-1 - FIXTURE LOCATION PLAN
F1 - FIXTURE DETAILS
F2 - FIXTURE DETAILS
F3 - FIXTURE DETAILS
F4 - FIXTURE DETAILS
F5 - FIXTURE DETAILS CUSTOMER SERVICE
F6 - FIXTURE DETAILS PHARMACY
F7 - FIXTURE DETAILS PHARMACY
STRUCTURAL
S-1 - FOUNDATION PLAN
S-2 - ROOF FRAMING PLAN
 
(Addendum #1 - 5/17/10)
S-3 - FOUNDATION DETAILS
S-4 - ROOF AND STEEL SECTIONS/DETAILS
S-5 - MISC STRUCTURAL DETAILS
PLUMBING
P1.0 - PLUMBING PLAN
P1.1 - WATER PLAN
P2.1 - PLUMBING DETAILS
P3.1 - REFRIGERATION PLAN
P4.1 - PLUMBING NOTES
MECHANICAL
M-1 - MECHANICAL-HVAC PLAN
 
(Addendum #1 - 5/17/10)
M-2 - MECHANICAL ROOF PLAN
 
(Addendum #1 - 5/17/10)
M-3 - MECHANICAL SCHEDULES AND DETAILS
 
(Addendum #1 - 5/17/10)
SPRINKLER
SP-1 - SPRINKLER D/B CRITERIA PLAN
ELECTRICAL
E-1 - LIGHTING PLAN
E-2 - POWER PLAN
E-3 - REFRIGERATED CASE PLAN
E-4 - BAKERY/MEAT/PRODUCE
E-5 - CHECKOUT/OFFICE
E-6 - ROOF PLAN & DETAILS
E-7 - RISER & PANEL SCHEDULES
E-8 - PANEL SCHEDULES
E-9 - COMMUNICATIONS WIRING
FIRE ALARM
FA-1 - FIRE ALARM PLAN
SPECIFICATIONS
00 - ADMINISTRATION
01 - GENERAL REQUIREMENTS
02 - SITE CONSTRUCTION
03 - CONCRETE
04 - MASONRY
05 - METALS
06 - WOOD & PLASTICS
07 - THERMAL & MOISTURE PROTECTION
08 - DOORS & WINDOWS
09 - FINISHES
10 - SPECIALTIES
11 - EQUIPMENT
12 - FURNISHINGS  
(NOT USED)
13 - SPECIAL CONSTRUCTION
14 - CONVEYING SYSTEMS  
(NOT USED)
15 - MECHANICAL
16 - ELECTRICAL
ADDENDUMS
ADDENDUM #1
 
(Issued: 5/17/10)
ADDENDUM #2
 
(Issued: 5/18/10)
ADDENDUM #3
 
(Issued: 5/21/10)
CHANGE ORDERS
CHANGE ORDER #1
 
(Issued: 5/27/10)